Engineering Fees
Fees as of July 1, 2025
Construction plan review (per improvement value):
- Up to $50,000.00: $938.00
- $50,001.00 to $250,000.00: $1,875.00
- $250,001.00 to $500,000.00: $2,500.00
- $500,001.00 to $1,000,000.00: $3,125.00
- Over $1,000,000.00: 0.50% of value
Construction plan review (4th – final review): $625.00 per additional review
Revised submittal to approved plans (minor): $313.00
Revised submittal to approved plans (major): $563.00
Minor plan review (redevelopment minor and water minor): $438.00
Minor plan review – inspection fee: $625.00
Stormwater maintenance agreement (plus actual cost of recording): $157.00
Fire protection system agreement (plus actual cost of recording): $188.00
Stormwater permit: $63.00
Verification of available city services letter: $63.00
FDEP water line permit processing fee: $125.00
FDEP sewer line permit processing fee: $125.00
FDOT utility permit processing fee: $94.00
Water system pressure retests: $125.00
Pro-rata agreement: $438.00
Right-of-way use permit (state/county/city) processing fee: $94.00
Right-of-way use agreement: $438.00
Concurrency – water (outside of city): $125.00
Inspections:
- Value up to $75,000.00: $1,407.00
- Value over $75,001.00: 2% of project value
Pre-final/final re-inspection:
- First: $350.00
- Second: $375.00
- Third: $438.00
Land Alteration Permit:
- Erosion/sedimentation control review: $188.00
- Underbrush clearing (applicant fee) plus fees below: $100.00
- < 1-acre development: $50.00
- 1-acre to 5-acre development: $75.00 per acre
- > 5-acre development: $100.00 per acre
- Tree removal (application fee) plus fees below: $100.00
- Existing one-, two- and three-family dwellings (per Florida Statute): EXEMPT
- Affordable housing individual one-, two- and three-family lot (low/very low): EXEMPT
- Affordable housing development (low/very low): $10.00 per tree/palm with a cap of $1,000
- < 1-acre development: $100.00 per DBH-inch / $100.00 per palm
- 1-acre to 5-acre development: $125.00 per DBH-inch / $125.00 per palm
- > 5-acre development: $150.00 per DBH-inch / $150.00 per palm
- Grand tree: $300.00 per DBH-inch
- Buy-out fee in lieu of (per tree)*: $275.00 |
*Allowed per the Native Tree Replacement Fund (Appendix D, Section 9.272(l))
Abandon and vacate:
- Easement: $780.00 (plus actual advertising costs)
- Right-of-way: $1,250.00 (plus actual advertising costs)
Construction Bonds:
- Overtime Inspection Bond: $500
- As-built Inspection Bond: $850
- Right of Way Restoration Bond: $1000
- Water Outside of City As-built Bond: $3000
- Meter Placement Bonds (Based on Revised Estimated Cost of Dedicated Utility Systems):
- Up to $5,000: $500
- $5,001-15,000: $750
- $15,001-25,000: $1,000
- $25,001-50,000 $1250
- $50,001-75,000: $1,500
- $75,001-100,000: $1,750
- $100,001: and over 2%