|

Conservation Newsletter

Public
Works & Utilities
Connection Newsletter |
John A. Buckley
Surface Water Treatment Plant Specifications
Name and Address of Plant:
John A. Buckley Surface Water Treatment Plant
5985 Lake Washington Road
Melbourne, FL 32934 |
Contact Information:
Fred Davis, Superintendent
Phone: (321) 255-4622
Fax: (321) 255-4636 |
|
Engineering and Design
Firm:
CH2M Hill, Orlando, Florida |
Start-up Date:
February, 2002 |
| |
|
Actiflo:
Design Capacity: 20 MGD
Number of Trains: 2
Capacity per Train: 10
MGD |
|
| |
Coagulation/Flow
Distribution Tank
Number of
Tanks per Train: 1
Dimensions: 12' x 8' 9"
Depth: 20' |
Injection
Tank
Number of Tanks per
Train: 1
Dimensions: 12' x 9' 9"
Depth: 20' |
| |
|
Maturation
Tank
Number of Tanks
per Train: 1
Dimensions: 18' 2" X 19' 6"
Depth: 20' |
Settling
Tank
Number of Tanks per Train: 1
Dimensions: 19' 6" X 19' 6"
Depth: 20' |
| |
|
|
Total Process Time
for 20 MGD: 20 minutes
|
| |
|
|
Filtration System |
Design Flow:
30 MGD max. per day
Number of
Filters:
6
Type: Dual
media
Cells per
Filter:
2
Dimensions of
Cell: 24'
x 15'
Filtration Rate
(1 unit out of service): 3.9
gpm/FT2 |
Backwash Pumps: 2
Capacity:
9,000 gpm
Air Backwash System: 2
Type: Rotary
Positive Displacement
Blower Capacity:
1,800 SCFm
Rate: 3-5
SCFm/FT2
|
|
|
|
|
Blending/CT
Pump Station
|
Type:
In-ground Concrete
Mixing Type: Multiple weir
Minimum T10 Detention Time:
3 minutes |
Transfer
Pumps: 4
Type:
Horizontal Centrifugal Split Case
Maximum
capacity: 3,500 unit gpm @ 20 ft. |
|
|