I: TREE
PROTECTION
1. Tree Removal/Relocation/Replacement
A. |
Requirements for Sites of one (1) acre or more |
1. |
Two copies of certified tree survey showing existing
protected tree sizes and types (minimum 4" diameter measured 3' above
grade).* |
2. |
Two copies of entire site
fshowing location and size
of all buildings, parking areas, utilities, elevations (existing and
proposed), green areas, drive areas, and description of adjacent property
uses.* |
3. |
Description of tree protection measures. |
* |
Tree Survey and Site Plan
shall be incorporated on one
page |
| |
|
B. |
Requirements for Sites of one (1) acre or less |
1. |
Two copies of a tree survey showing existing
protected tree sizes and types (minimum 4" diameter measured 3' above
grade). Trees may be hard drawn in if
accurate. |
2. |
Two copies of entire site showing location and size
of all buildings, parking areas, utilities, elevation (existing and
proposed), green areas, drive areas, and description of adjacent property
uses. |
3. |
Description of tree protection measures. |
* |
Tree Survey and Site Plan
shall be incorporated on one
page |
2. Tree Permit Fees
$ 15.00 |
Permit Fee |
$ 10.00 |
Each tree removed |
| $ 100.00 |
Maximum/Residential |
| $ 1,000.00 |
Maximum/Commercial |
No fee for trees relocated on site - Mitigation for
tree removal will be on an individual basis
3. Tree Protection
Requirements
All non-exempted trees on site shall remain unless it
is determined by the Building Official that removal is required. Said
trees shall have a visual barricade erected around the outside of the drip
line prior to any work on site.
Trees listed under exceptions (Section
9.272 (b)) shall
require no permit. These include: Punk, Paperback, Norfolk Island Pine,
Australian Pine, Brazilian Pepper, Bishopwood, Castorbean, Poisonwood,
Chinaberry, Eartree and Eucaluyptus (all varieties except Cinerea). |
II. SOIL CONSERVATION
REQUIREMENTS
1. Requirements Prior to
Clearing or Building
| A) |
Erosion and Sedimentation Control permit shall be
submitted to the Engineering Department prior to commencing work. For
issuance of the permit the following information will be required with the
application. |
| |
|
|
|
1. |
Narrative of the overall project, including: |
|
|
|
|
|
|
(a) |
Time frame for project |
|
|
(b) |
Description of erosion control and practices |
|
|
(c) |
Description of adjacent property uses |
|
|
(d) |
Description of re-vegetation plan |
|
|
|
|
|
2. |
Maps, drawings, and computations by Licensed
engineer containing the following: |
|
|
|
|
|
|
(a) |
Site location |
|
|
(b) |
Temporary and permanent vegetative control measure
plan |
|
|
|
|
|
3. |
Brief description of on-site plant species denoting
the existence of any endangered/protected plants or animals. |
|
|